Step 2: Suction Conditions & NPSH Evaluation
โพสต์เมื่อ : 19 มิ.ย 2569 เวลา 3:9 น.
(Prevent cavitation)
Required Data
- Suction source (tank, pit, pipeline)
- Liquid level (minimum / normal / maximum)
- Suction pressure
- Suction linesize & length
- NPSHa (Available)
Vendor Requirement
- NPSHr at rated point
- Minimum NPSH margin (API 610 recommended)
NPSHa must always be greater than NPSHr.